Kensington House, student accommodation
This old building was transformed from a ruin to a new modern student accommodation residence to a tight programme, complete strip out of existing MEP services was carried out installing new MEP services to the entire build
Client: Birmingham Property Group
Duration: 24 weeks
Services:
Scope of works:
Electrical
- TVSS surge protection
- LV Distribution
- General & Emergency Lighting
- Lighting control system
- Small Power
- External Lighting
- Structured Cabling
- Access Control
- CCTV
- Intruder Alarm
- IRS and Fibre Installations
- Fire Alarm
- Disabled W.C Alarm
- Audio Visual Systems
Mechanical
- Main CHP Plant room at Roof Level
- VRV Heating and Cooling
- Electric Heating
- Hot water service
- Mains cold water service
- Toilet supply and extract
- Ventilation – heat recovery fresh air unit
- Sanitaryware and plumbing
- Above ground drainage
- Building Management Systems
- Dry Riser Installations