No. 1 Colmore Square
This substantial 6 storey Cat B fit-out consisted of a complete new layout of partitioned walls to form offices, lift lobbies, new toilets and the creation of a basement shower / changing room block. New MEP services were installed to the floor plates and communal areas with bespoke feature lighting to the main reception entrance.
Scope of works:
Electrical
- LV Distribution
- General & Emergency Lighting
- Lighting control system
- Small Power
- External Lighting
- Structured Cabling
- Access Control
- Speed gate Installations
- Meeting room Automation booking systems
- CCTV
- Fire Alarm
- Disabled W.C Alarm
- Mechanical Power
Mechanical
- Ambirad Gas fired heating
- VRV Heating and Cooling
- 4 Pipe Chilled Water and LTHW Installation
- Electric Heating
- Hot water service
- Mains cold water service
- Toilet supply and extract
- Ventilation – heat recovery fresh air unit
- Sanitaryware and plumbing
- Above ground drainage
- Building Management systems