Sandicliffe Nissan
TNA were awarded the contract to fully design, supply and install the Mechanical, Electrical and public health
systems to the new Sandicliffe Nissan garage.
Client: Sandicliffe Motor group
Duration: 34 Weeks
Services:
Scope of works:
Electrical
- LV mains distribution & Earthing
- TVSS surge protection
- General & Emergency Lighting
- Lighting control system
- Small Power
- External Lighting
- Structured Cabling
- Access Control
- CCTV
- Intruder Alarm
- P.A
- Fire Alarm
- Disabled W.C Alarm
- P.V System
Mechanical
- Ambirad Gas fired heating
- VRV Heating and Cooling
- Electric Heating
- Hot water service
- Mains cold water service
- Toilet supply and extract
- Ventilation – heat recovery fresh air unit
- Sanitaryware and plumbing
- Above ground drainage